
Experience
Featured
All case studies
Rail and Tunnel Infrastructure Project runs into delays and disruption
A significant rail and tunnel construction project faced severe disruption due to the COVID-19 pandemic.
Wind Farm in New Zealand | Snapshot
Accura Consulting experts provide clients with a tailored approach to their problems, relying on a fact-based approach to analyse delays with impartiality.
Victorian Solar Farm Project
One of the challenges found in many renewables projects relates to connections and grid issues. For one major wind project in Victoria, this was the case for the EPC.
European EPC Wind and Battery Storage Facility | Snapshot
Accura Consulting was engaged by a major European Bluechip client to assist in the recovery of time and cost following delays on the project.
Metro City Road Tunnel, Australia | Snapshot
Accura Consulting was employed by a major Employer following delays to a significant metro city road tunnel with a value of $5bn.
Sydney Arterial Road Project, Australia | Snapshot
Engaged by a major Tier 1 Contractor on a construct only road project, Accura Consulting supported the Contractor in preparing both quantum and delay claims, translating a complex set of delays into clear, easy to understand analysis.
Road and Bridge Project, Australia | Snapshot
Accura Consulting was engaged by an international Tier 1 Contractor following delays to a road and bridge design and construction project in Australia.
Education Facility, Australia | Snapshot
Accura Consulting’s delay experts were engaged following a delay in the construction and refurbishment of an education facility located in Australia.
Road Tunnel Delay | Snapshot
2020 and 2021 were challenging years for the construction industry. Accura Consulting experts were engaged to support a significant road tunnel project faced with delays and cost overruns relating to COVID-19.
Dubai Shopping Mall | Snapshot
Shopping malls are a major attraction in Dubai and disputes arising there need to be handled quickly and efficiently.
Residential Apartments | Snapshot
Accura Consulting was engaged as a quantum expert to analyse a large residential apartment building following a construction dispute.
New Build Ferry Hub in Sydney
Sydney is well-served by marine transport being ‘The Harbour City’. This project was the construction of a new ferry hub in central to the city, designed to increase ferry capacities and transportation services for thousands of travellers.
Medical and Radioactive Facility in Greater Sydney
A project to complete works to a medical and radioactive facility in Greater Sydney encountered a number of issues.
Electrical Substation new builds in Sydney
The New South Wales Power Supply Upgrade Program introduced new Substations and Substation upgrades across the state to generate more robust and reliable power supply.
Pacific Highway Upgrade Project in northern New South Wales
A major highway upgrade project to introduce 20 kilometre of dual carriageway including bridges over rivers and flood plains, completed in mid-2018.
Procurement support for a mining owner and operator in South Australia
A large mining owner and operator required a contractor to conduct underground mining services at one of its sites in South Australia.
Major Road Bridge Replacement Project
A major bridge replacement project in southern New South Wales was launched to help build netter connection in and around the bay town for motorists, freight, river users, pedestrians, and cyclists.
Major Regeneration Project Development in Sydney
The Project was a major redevelopment along the Sydney foreshore which includes a mix of commercial and residential buildings, an entertainment precinct, harbour walk and public parkland.
140ML Wastewater Treatment Plant Upgrade
The project involved the design and construction of a new sewage treatment facility with a hydraulic capacity of 140ML/day.
Woolgooga to Ballina Road and Bridge Pacific Highway
The Woolgoolga to Ballina Pacific Highway upgrade was the final link in the Pacific Highway upgrade, between Hexham and Queensland border to be upgraded to four lanes, divided carriageway
Never miss an update
Sign up with your email address to receive news and updates.